On average, hardwood floor installation takes between one and three days. It is typical for two installers to lay 750 to 1,000 square feet of flooring a day, with the average size of a job being 1,000 to 1,500 square feet.

Silky Terrier Dog Breed Playing Aro... Silky Terrier Dog Breed Playing Around

Can you walk on hardwood floors after installation?

We recommend that you wait at least six hours before putting your feet on your new floors. You’ll be able to put your shoes on after 24 hours. Restoring furniture and bringing pets home should be done after at least 48 hours. After a full week, carpets and rugs can be installed.

How long does it take to install 1500 square feet of hardwood floors?

With a crew of at least two people, it should take between one and three days to complete a 1,500 square foot hardwood floor installation. Even though this procedure is simple and won’t cause too much inconvenience for you and your family, it could still go wrong.

How long does it take to lay 1000 square feet of hardwood?

For 1,000 square feet or less, the total installation time is 4-9 days + 1 day drying + additional days for floor prep and tile rip-up. For 1,000 sf or less, the total time elapsed is between 1-2 weeks.

How long should wood floor sit in house before installing?

The first step in acclimating wood flooring on the job site is to store it properly. In order to keep the boards cool, they should be arranged in a way that allows air to circulate around them. Materials should acclimate for no more than three days, as recommended by most manufacturers.

Can I stay in my house while floors are refinished?

Even if there are other rooms to sleep in, it’s best to stay out of the house for at least five days after the job is finished because the fumes/off-gassing is not safe to breathe in.

How long do floors take to settle?

When it comes to humidity, temperature, and light, you can expect different responses from the wood. A general rule of thumb is to wait at least four seasons before installing wood flooring.