Hardwood floor installation can take anywhere from a single day to three days on average. The typical size of a job is between 1000 and 5000 square feet. Installation of 750 to 1000 square feet of flooring per day is common for two-person teams.

Silky Terrier Dog Breed Playing Aro... Silky Terrier Dog Breed Playing Around

How long does it take to install 1000 sq ft of hardwood floor?

If you’re working with less than 1,000 square feet, you can expect to spend anywhere from a few days to a few weeks on the job. For 1,000 sf or less, the total elapsed time is between 2 and 4 weeks.

How long does it take to finish a hardwood floor?

If you’re refinishing hardwood floors with an oil-based polyurethane (plus drying time), you can expect the process to take anywhere from three to five days. This is dependent on the type of stain, how dark it is, and how humid the area is.

How long does it take to install 1500 square feet of hardwood floors?

It should take a crew of at least two people just one to three days to install hardwood flooring on a 1,500-square-foot or smaller project. Even though this procedure is simple and won’t cause too much inconvenience for you and your family, it could still go wrong.

Can you walk on hardwood floors after installation?

We advise that you wait at least six hours before putting your feet on your new floors. You’ll be able to walk through with your shoes on in 24 hours. Restoring furniture and bringing pets home should be done after at least 48 hours. After a full week, carpets and rugs can be installed.

What is the best time of year to install hardwood floors?

The best time of year to install hardwood flooring is usually in the early fall. If you want to install new wood floors this fall, you should wait until it’s cooler outside and there’s less moisture in the air.

How long should wood floor sit in house before installing?

Getting wood flooring used to the job site begins with proper storage. It should be arranged in a way that allows air to flow around the boards. No maximum acclimatization period has been established by most manufacturers.